MATERIALS

Aluminium forging alloys: 6061 · 6063 · 6082 · 7075 · 2A14

Four certified aluminium alloys, one forging floor. Material certificates per batch — pick by load, environment and program region.

Alloy quick guide

AlloyCharacterBest forDetail page
6061-T6The workhorse — strong, weldable, anodises beautifullyBicycle drivetrain, general structural6061 properties →
6063-T6Finest surface finish, slightly softerAppearance parts, thin sections—
6082-T6European workhorse (EN AW-6082), a step above 6061EU programs, structural parts—
7075-T6Aircraft grade — highest strength-to-weightHigh-load, weight-critical components7075 properties →

Every batch ships with a mill certificate. Send your drawing and alloy — or let us recommend one based on the load case.

FAQ

Common questions

Which alloys can you forge?

6061, 6063, 6082 and 7075 — every batch ships with a mill certificate.

What quality documents do you provide?

A mill certificate per alloy batch and a dimensional report with every shipment; finished-part inspection report on request.

Which file formats can I send?

STEP, STP, DWG, DXF and PDF — even a clear photo of a print works for a first feasibility opinion.

Do you support prototypes and small batches?

Yes — batches are quoted per part number depending on size and die amortisation, and prototypes are possible.

What press sizes do you run?

Closed-die forging presses from 300T to 2500T, covering small components up to large structural parts.

Can you machine and finish parts too?

Yes — CNC finishing to Ra 0.8 (per-drawing review), plus anodising Type II/III, sandblasting, polishing, brushing and spray painting.

Do you sign NDAs?

Yes. Tooling and dies are designed and built in-house, so your drawings stay confidential under NDA.

How fast do you reply to a drawing?

Most drawings receive a 1-day quote with a feasibility opinion and cost range.

Where do you ship from?

Our factory in Guangming District, Shenzhen, with export packing and worldwide delivery.

Can we audit your factory?

Yes, customer audits are welcomed — and quality evidence is available before you commit to a program.

Scroll to Top